Not sure what's due next class? Check below. The top boxes should be what is due for the next classes. The boxes below that are what was due for previous classes. Questions about what is due? Email me.
For Tuesday 11.26.2019
E18 - Due on your site
P4 - One page with responsive sizes
P5 - First draft of site (coded or design)
For Thursday 11.28.2019
No Class!
For Tuesday 11.19.2019
P3 - Due (second deadline)
E17 - Due on your site
P5 - Two or three ideas for your single serve site
For Thursday 11.22.2019
P4 - Digital designs for all pages at desktop or all mobile sizes
For Tuesday 11.12.2019
P3 - Due (first deadline)
For Thursday 11.14.2019
P4 - Site map (digitally done), wireframes (desktop and mobile for each page, 8 total wireframes), reference sites (2 to 3)
For Tuesday 11.05.2019
P3 - Full responsive site draft (works across all sizes)
For Thursday 11.07.2019
P3 - Full responsive site draft (works across all sizes)
For Tuesday 10.29.2019
E14 - Due on your site
P3 - Coded desktop or mobile version
For Thursday 10.31.2019
E16 - Due on your site
P2 - Due
For Tuesday 10.22.2019
E12 - 3 layouts from E5 or E7 coded on as separate pages and linked on your site.
For Thursday 10.24.2019
E15 - Your instructions, your image, and the images two other people made of your instructions on a single page on your site.
P2 - Continue working on it
For Tuesday 10.15.2019
No Class.
For Thursday 10.17.2019
E13 - Image file(s) up on your site
P2 - Second full digital draft with all final content across all 4 screen sizes (1440px, 1024px, 768px, 320px). These should be exported as PNGs so we can view them full size in a browser.
For Tuesday 10.8.2019
Nothing due.
For Thursday 10.10.2019
E11 - Screen shot of all sizes up on your site
P2 - First full digital draft with all final content across all 4 screen sizes (1440px, 1024px, 768px, 320px). These should be exported as PNGs so we can view them full size in a browser.
For Tuesday 10.1.2019
E8 - The first three (checkerboard, columns, and blog) on your site. Also an attempt at the fourth one (tennis court).
P1 - Final site due and linked on your site.
For Thursday 10.3.2019
E9 - Site map exported as a PNG and uploaded to your site.
E10 - Two wireframes (one for a desktop width and one for a mobile width) uploaded to your site. Could be done by hand or done digitally.
P2 - Wireframes (digitally or sketched) for a desktop width and a mobile width. The should be printed if they were done digitally.
For Tuesday 9.24.2019
E6 - 5 patterns uploaded and linked on your site.
P1 - All your pages with content and working links plus initial designs (type styles, link styles, general page layout)